Recent Updates

Generator Running SOP and Checklist

Generator Running SOP and Checklist

  • Notify crew generator will be turned on for specified time (normally 1-3 hours)
  • Plug in all 120VAC chargeable devices into system (check if snooba needs charging)
  • Determine if water maker is to be run
  • Determine if any power tools are to be run
  • Determine if hookah is to be charged
  • Determine if microwave is to be run
  • Determine if washer dryer is to be run
  • Verify oil & coolant levels are OK on generator, belt is OK
  • Check thru hulls are open for raw water intake and exhaust
  • Check that no-one is in forward generator hatch
  • Start generator engine
  • Verify exhaust water is running through hull near genset
  • Turn on 120VAC system to loads
  • Turn on water maker and other items
  • When done, check various battery levels and turn off in reverse order
19 visitors online now
4 guests, 15 bots, 0 members
Max visitors today: 24 at 05:35 am UTC
This month: 34 at 08-07-2018 09:35 pm UTC
This year: 93 at 01-24-2018 11:08 am UTC
All time: 131 at 09-02-2017 04:22 pm UTC